Contact us for pricing, additional details and documents
Specific attachment for the transport of tunnel rings.
The pre-arrangement varies according to the machine model and must be ordered separately.
Function 1 locks the tunnel ring on the attachment.
The horizontal position of the boom, necessary to place the tunnel ring on the ground, is obtained by tilting the carriage of the machine.
The 75 degree rotation of the head (2) helps reduce the overall front dimensions of the tunnel ring during transport.
Manually adjusting tunnel ring retaining wedges.
Contact us for pricing, additional details and documents
We provide support to our clients for maintenance and repair for their equipment.